Hi-Teck Qazaqstan Projects

First phase of a 247 MW hybrid energy complex powering oil & gas operations in Mangystau, delivered as full-cycle EPC including solar park, 110/35 kV substation, 110 kV overhead line and expansion of the existing 220/110/10 kV substation. Followed by long-term O&M ensuring sustained PR and TA targets.

Solar plant for a gold mining operation, integrated into the site's power node, which covers mining pit and factory’s electrical consumption. Delivered under a wider memorandum covering 22.6 MWp SPP + 17 MWp SPP + 40 MW GPP. EPC scope included solar park, expansion of the existing 110/10 kV substation and a 10 kV transmission line, followed by O&M ensuring contractual PR and TA targets.

Integrated high-level automation and control system for a complex mine-site power node combining a 40 MW gas power plant and a 22.6 MWp solar plant. Designed and built to to mee KEGOC AFPC requirements, with full SCADA, metering, cybersecurity, relay protection and emergency-event recording subsystems.

Reconstruction and modernisation of the fire-suppression system at a strategic 500 kV KEGOC substation, delivered end-to-end as general contractor — from procurement of materials and equipment through construction, commissioning and handover.

Reconstruction and modernisation of the fire-suppression system at the 220 kV Tengiz substation, delivered end-to-end as general contractor — from procurement through construction, commissioning and handover.

Reconstruction and modernisation of the fire-suppression system at the 220 kV Aktobe substation, delivered end-to-end as general contractor — from procurement through construction, commissioning and handover.

Solar plant powering the Bakyrchik mining node, delivered under a wider memorandum covering 22.6 MWp SPP + 17 MWp SPP + 40 MW GPP. EPC scope includes solar park, expansion of the existing 110/35 kV substation and a new 35 kV transmission line, followed by long-term O&M.

Large-scale solar project delivered as construction contractor under CEEC's general EPC scope. Hi-Tech Group performed solar park construction, commissioning and system startup, including mobilisation, resource management and quality assurance.

One of the largest solar plants in Central Asia, delivered for Masdar under SEPCO 3 as general EPC. Hi-Tech Group performed solar park construction, commissioning and system startup as part of a multinational delivery team.

Small-scale captive solar plant delivered as turnkey EPC, including the solar park and associated power evacuation infrastructure. Demonstrates Hi-Tech Group's ability to deliver to industrial off- takers across the full project lifecycle.

Utility-scale solar plant. Hi-Tech Group performed solar park construction, commissioning and system startup integration.

International utility-scale solar project delivered for Masdar with SEPCO 3 as general EPC. The Hi-Tech Group team performed solar park construction, commissioning and system startup as part of a multinational delivery team.

Full-cycle utility-scale solar project covering development services and grid permitting, construction of the solar park, 35/10 kV substation and 35 kV transmission line, plus Owner's Engineer support. Followed by long-term O&M ensuring contractual PR and TA targets.

Utility-scale solar plant delivered as turnkey EPC, including solar park and new 110/35 kV substation, 110 kV overhead line construction and reconstruction of the 220 kV KEGOC JSC substation. O&M services

Cross-border solar PV project delivered in Ukraine for a Georgian industrial group, including solar park construction, system commissioning and startup. Demonstrates Hi-Tech Group's ability to deliver EPC services beyond Central Asia.

Full-cycle utility-scale solar PV project delivered from greenfield development through grid integration, including a 110/35 kV outgoing substation and 110 kV overhead line.
The Hi-Tech Group team handled GR, EPC and ongoing O&M to maintain contractual PR and technical availability indicators.

One of Kazakhstan's flagship utility-scale solar projects, delivered in two 50 MWp phases. Scope included full development, EPC of solar park, a 220/20/10 kV substation and 220 kV overhead line, and reconstruction of the connected 500 kV KEGOC substation. Followed by long- term O&M to maintain PR and technical availability.